Notice: curl_setopt(): CURLOPT_SSL_VERIFYHOST no longer accepts the value 1, value 2 will be used instead in /home/admin/web/eastrussia.ru/public_html/gtranslate/gtranslate.php on line 101
"Svetloe" and "Unchi" input base will work at the expense of alternative energy sources - EastRussia |

Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

Bright half of the sun and the wind

"Svetloe" and "Unchi" input base will work at the expense of alternative energy sources

Bright half of the sun and the wind
Photo: Sol-Iletskaya SES, similar will be installed on Svetloy. CC "Polymetal"

At the Svetloe field and the input base of "Unchi" this year alternative sources of energy will be tested. The rate is made for solar and wind power stations. Renewable energy sources are environmentally friendly and will allow to significantly save on the consumption of diesel fuel.

"Solar and wind energy are environmentally friendly," says Stanislav Timohovsky, director of the project management of the Khabarovsk branch of Polymetal UK. - The company is focused on meeting the environmental requirements of world standards and this is very important. After all, one of the leading areas of our work is to reduce emissions to the environment. "

The solar power plant will be installed at the mining and processing plant "Svetloe".

"The solar power plant consists of high-efficiency modules with an output of 360 Watt each (total about 2800 units), which in total will give the power of 1 MW. Modules will be mounted on screw piles, which are intended for use in permafrost conditions. The complex will include: inverter equipment, a transformer and a control system, says Anton Usachev, deputy general director of the Hevel group of companies. - The principle of the solar power plant is simple: the surface of the module catches light and due to the conductor properties of silicon converts it into electrical energy. "

The wind power plant will be installed on the input base of "Unchi". The principle of its operation is based on the conversion of wind energy into rotational motion of the turbine. This happens with the help of blades (rotor). The wind follows the contour of the blade, leading them to rotate, thus producing pure wind energy.

The schedule of works on installation of system is already made. Now the equipment is being manufactured. In June, it will go to Nakhodka, from where the very first navigation flights will be delivered to Svetloye and Unchi. The solar power plant itself is quite voluminous. Under her specialists Svetliy have already prepared the site.

"The solar power plant will be located on the site 200 at 200 meters. The necessary excavation work has already been carried out, - says Victor Oskolkov, chief engineer of the "Svetloe" mine. - The facility will be located next to the energy complex in order to minimize the costs of building power lines. Everything will look compact. "

The contractor for the construction of an industrial solar power plant with the capacity of 1 MW was the company Hevel. According to experts, the operation of the power plant will save the enterprise up to 250 tons of diesel fuel annually. The minimum service life of the station is 25 years. The specialists intend to complete the works on installation and connection of wind generators and solar power station before the end of the year.