Notice: curl_setopt(): CURLOPT_SSL_VERIFYHOST no longer accepts the value 1, value 2 will be used instead in /home/admin/web/eastrussia.ru/public_html/gtranslate/gtranslate.php on line 101
Chinese SRESS will design Amur GPP for NIPIGAZ - EastRussia | Far East

Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

Chinese STRESS will design the Amursky GPP for NIPIGAZ

The contract for design work on the construction of the Amur Gas Processing Plant (GPP, Priamurye) will be concluded with China Petroleum Engineering & Construction Corporation (SRESS, CNPC subsidiary) according to the results of the open tender, the customer said PJSC Gazprom. The general contractor for the construction of the Amur GPP is the NIPIGAZ structure of Gazprom. Reportedly, a contract with SRESS will be signed soon.

The contract includes the design, manufacture, supply of equipment, construction of booster compressor shops, gas drying and cleaning facilities, gas fraction equipment. At the same time, compressors and automation systems should be of Russian production, follows from the terms of the tender.

The capacity of the Amur GPP is planned at 42 billion cubic meters. M gas per year, which makes the project one of the largest in the world. The plant will also produce up to 60 million cubic meters. M helium per year, in such volumes helium is not produced anywhere in the world.