Notice: curl_setopt(): CURLOPT_SSL_VERIFYHOST no longer accepts the value 1, value 2 will be used instead in /home/admin/web/eastrussia.ru/public_html/gtranslate/gtranslate.php on line 101
The highest drilling rig in Transbaikalia was used to repair a road in a village - EastRussia | Far East

Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

The highest drilling rig in Transbaikalia was used to repair the road in the village

The highest drilling rig in Transbaikalia was used to repair the road in the village

In the Transbaikal village of Darasun, Karymsky district, when repairing the overpass, the contractor applied the Bauer drilling rig, the highest in the region. “This is a very powerful machine, capable of drilling all soils to a depth of about 10 meters during the day. In general, the maximum drilling depth is 58 meters, ”said Ruslan Shakurov, a leading specialist in the quality control and acceptance department of the Single Customer Service. The contractor will have to drill nine wells for three legs. The total length of the new road will be 90 meters. Work on the reconstruction of the overpass began in April of this year, and the deadline for commissioning is scheduled for October 15 2021.

The reconstruction of the overpass in Darasun is carried out as part of the national project "Safe and high-quality roads." Total Trans-Baikal Territory in the period from 2019 to 2024. will receive 21 billion rubles to bring the regional road infrastructure in a normative state. Contractors will repair more than 1078 kilometers of roads. Funds for the implementation of the national project will be allocated from the federal and regional budgets.

Earlier it was reported that in 2019 on the Trans-Baikal roads two stationary automatic points of weight and size control will be installed. They will appear on sections of the Nerchinsk-Shonoktuy and Balyaga-Yamarovka roads. Four more such points should be installed on the roads of Transbaikalia before the 2024 year.