Notice: curl_setopt(): CURLOPT_SSL_VERIFYHOST no longer accepts the value 1, value 2 will be used instead in /home/admin/web/eastrussia.ru/public_html/gtranslate/gtranslate.php on line 101
Vostochny Port Starts Installation of a Dustproof Screen for Stage 3 - EastRussia | Far East

Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

This text is translated into Russian by google automatic human level neural machine.
EastRussia is not responsible for any mistakes in the translated text. Sorry for the inconvinience.
Please refer to the text in Russian as a source.

Vostochny Port began the installation of a dust-proof screen on Stage 3

Vostochny Port JSC has begun the installation of perforated panels of dust and heat protection screens on the Third stage of the high-tech coal complex in Primorye. Their total area will be 32,3 thousand square meters. meters

Steel sheets with many small holes are attached to metal frames with a height of 20 meters and a total length of 1,7 km, installed along the entire perimeter of the Third Line. According to the press service of the company, the fence is erected in stages: first, the foundations are installed, then the metal frame is installed, the final stage is the fixing of the dust screen panels. Investments in the creation of a protective screen on the Third stage are about 400 million rubles.

Now Vostochny Port is creating similar fences throughout the existing coal terminal. Dust protection screens have been developed using the best available technologies for environmentally safe coal handling.