Notice: curl_setopt(): CURLOPT_SSL_VERIFYHOST no longer accepts the value 1, value 2 will be used instead in /home/admin/web/eastrussia.ru/public_html/gtranslate/gtranslate.php on line 101
Nizhne-Bureiskaya HPP. Latest News - Eastrussia - Russian Far East

Irkutsk
Ulan-Ude

Blagoveshchensk
Chita
Yakutsk

Birobidzhan
Vladivostok
Khabarovsk

Magadan
Yuzhno-Sakhalinsk

Anadyr
Petropavlovsk-
Kamchatsky
Moscow

Nizhne-Bureyskaya HPP

Home

05.02.2018

Axes of the gates of Nizhne-Bureyskaya HPP will be replaced after the damage in 2017 year

Read More

26.09.2017

"RusHydro" will introduce the fourth hydroelectric unit of Nizhne-Bureyskaya HPP

Read More

25.08.2017

As a result of the accident, the Nizhne-Bureyskaya HPP was flooded with an engine room

Read More

20.04.2017

Nizhne-Bureyskaya HPP issued the first electricity in a test mode

Read More

11.08.2016

A new transport scheme in the Amur region will facilitate access to the Nizhne-Bureyskaya HPP under construction

The issue of cargo transportation to the Lower-Bureiskaya HPP under construction in the Amur Region will now be resolved through a reduced transport scheme: road transport will now go along the crest of the dam from the right to the left bank of Bureya through a through road pass

Read More

30.05.2016

In the second quarter of 2017, the construction of the 2 line of the Nizhne-Bureyskaya HPP will be completed - Alexander Kozlov

In the second quarter of next year, it is planned to finish the construction of the second stage of the Nizhne-Bureyskaya HPP

Read More

19.04.2016

The construction schedule of the Nizhne-Bureyskaya HPP keeps RusHydro

On Tuesday, the builders of the Nizhne-Bureyskaya HPP (Amurskaya Oblast) blocked the Bureya River in the station's site, laying about 1 thousand cubic meters of soil and concrete blocks in the breakwater (part of the channel serving to pass water during the construction of the hydroelectric complex)

Read More

13.04.2016

Within the framework of the construction of the Nizhne-Bureyskaya HPP, the Bureya River will be closed on 19 April

The builders of the Nizhne-Bureyskaya HPP in the Amur Region will block the Bureya River in the alignment of the station 19 April

Read More

29.01.2016

Annual tax allowance for RusHydo approved by the authorities of the Amur region

In exchange for clearing the bed of the RusGido reservoir, an annual tax credit is granted

Read More

09.12.2015

RusHydro itself will start cutting down the forest in the bed of the reservoir of the Nizhne-Bureyskaya HPP in the Amur Region

Problems with financing the preparation of the bed of the reservoir of the Nizhne-Bureyskaya HPP may delay the start-up of a new station, so the authorities of the Amur Region suggested that JSC RusHydro start cutting down forests at the company's own expense in exchange for tax breaks

Read More

13.11.2015

Four hydrounits will be installed at the Nizhne-Bureiskaya HPP

At the end of November, the assembling of the first hydraulic turbo-alternators should begin on the assembly site of the Nizhne-Bureyskaya HPP in the Amur Region

Read More

04.08.2017

Nizhne-Bureyskaya HPP will be supplied by the sun

Russian President Vladimir Putin opened a unique energy hybrid in the Amur Region

Read More

Exclusive

15.04.2016

Think wider

The crisis is a crisis, but in the Far East, it seems, they think about it in the last place - while there are federal funding projects grow one by one like mushrooms

Read More

02.07.2015

Rescue Park

EastRussia - about a unique situation with the Bureysky park

Read More

30.03.2015

Flew, but promised to return

Oleg Kozhemyako came to the Amur Region to give the latest instructions to his former team

Read More

09.03.2015

Amur Region: results of the year

Between problems and perspectives

Read More